The long weekend project
Steve started my project last week by putting up some posts, warratahs and wire. He had to be very careful as under the ground we have our 75mm hydro water pipe, a septic tank and pipes plus the electric cable…
Steve started my project last week by putting up some posts, warratahs and wire. He had to be very careful as under the ground we have our 75mm hydro water pipe, a septic tank and pipes plus the electric cable…